With CMEC as General Contractor, the project includes one SGT5-PAC 4000F gas turbine unit, other main equipment, and some auxiliary equipment. The Berezov Power Plant is currently the largest gas-s...
2016年12月12日With CMEC as General Contractor, EREN project is two sets of 600MW supercritical coal-fired power generating unit,. These units are equipped with the wet type limestone FGD system and SCR De-Nox un...
2016年12月12日With CMEC as General Contractor, the project consists of a coal-fired power plant, a coal wharf, supporting facilities, power transmission lines and related substations. The project won: IPMA Out...
2016年12月12日The project includes design, procurement, transportation, construction, installment, commissioning, training and etc.
2016年12月12日With CMEC as General Contractor, the EPC project covers design, manufacture, delivery, civil engineering, installation, commissioning, engineering supervision of two 600MW units, personnel training...
2016年12月12日Group website group |Strategic Cooperation|Electronic Business Platform |Disclaimer
Copyright @ 2010-2016 China Machinery Engineering Co., Ltd.
Beijing ICP 05020580 Beijing public security No. 110 401 300 026
CMEC官方微信
CMEC手机版