Transmission Line and Substations for Djiploho Hydropower Project, Equatorial Guinea

发布时间:2016-12-12 文章来源: Reading times:

This is an EPC (turn-key) project ranging from engineering investigation, design, civil construction, equipment supply, transportation, installation, commissioning, trial operation, acceptance test through to formal operation.

Completion Time: May 2012