M.Phin – Saravan 115kV Transmission Project, Laos

发布时间:2016-12-12 文章来源: Reading times:

With CMEC as General Contractor, the EPC contract covers a 120KM double-circuit transmission project, a 50KM single-loop line hanging project, and the expansion of three substations in M.Phin, Saravan and Sekong, respectively.

The project is under construction.